Water Cooled Unit Install
100 Broadway
Unit, Piping, Valves, Ductwork, Fans, VFD, Controls, Electrical, Startup
2026
At 100 Broadway, our team completed a fast-paced 40-ton packaged unit installation requiring a full mechanical room transformation. The project began with demolition of the existing mechanical room on Thursday, followed by field assembly of the new packaged unit, which was delivered in multiple modules. Our team then completed the installation of new ductwork, piping, electrical, and controls before starting up and commissioning the system by Sunday. This project showcases our ability to execute complex HVAC installations on aggressive schedules while coordinating multiple trades and delivering a fully operational system within a matter of days.