Skip to main content Scroll Top
9 Barrow St.
9 Barrow Street

Categories:

Client:

Equipment:

Year:

Cooling Tower 

9 Barrow Condo Corp.

CT, CWS, CWR, VFD

2021

 

Axis performed a turnkey cooling tower installation for 9 Barrow, replacing the building’s existing outdated fluid cooler with a new BAC Nexus unit. Our team managed the project from start to finish, handling all aspects of the installation including permitting, equipment removal, rigging, piping, electrical, controls, and system integration. Axis coordinated the various phases of the project to ensure the new cooling system was installed efficiently and properly integrated with the building’s existing mechanical infrastructure.

From permits to commissioning, Axis provided a complete turnkey solution, overseeing the installation through final startup, testing, and system commissioning. The completed project provided 9 Barrow with a modern, more efficient cooling solution while demonstrating Axis’s ability to manage complex mechanical equipment replacements from initial planning through final operation.

LOOKING FOR A TRUSTWORTHY AND EXPERIENCED HVAC PARTNER?
HAVE A PROJECT?